Parliament Hill — Heritage masonry reinforcement

Ottawa, Canada · 2018

Pending review
Project photo coming soon
Problem

Long-term weathering and movement of heritage stone elements required reinforcement without altering exterior appearance.

CINTEC solution

Project-specific CINTEC anchors with concealed end conditions, designed for the stone substrate and applicable loads.

Technical notes

Anchor geometry, substrate condition and installation sequence were defined for the project. Specifics pending CINTEC confirmation.

Result

Reinforced heritage masonry with minimal visual intervention and preserved restoration intent.

CINTEC provides technical consulting, product guidance and project support within its authorized scope. Final design responsibility and structural analysis remain with the project's Engineer of Record.