Case Studies

Pyramid of Djoser — Archaeological stone reinforcement

Saqqara, Egypt · 2011

Pending review
Project photo coming soon
Problem

Centuries of weathering and prior interventions left fragile, heterogeneous stone requiring stabilization without modern visual intrusion.

CINTEC solution

Custom CINTEC anchors engineered for the substrate, with concealed end conditions appropriate to a heritage archaeological context.

Technical notes

Specific anchor configuration, installation methodology and grout selection pending CINTEC confirmation.

Result

Stabilization supporting the long-term preservation of an internationally significant heritage site.

CINTEC provides technical consulting, product guidance and project support within its authorized scope. Final design responsibility and structural analysis remain with the project's Engineer of Record.