Problem
Extensive cracking had developed between the stonework and brick masonry of the viaduct piers.
CINTEC solution
Anchors were drilled into the piers under water to reconnect the masonry fabric.
Technical notes
This project shows the system working in a submerged bridge condition with limited access.
Result
The viaduct was stabilized and remained in service as a historic railway structure.