← Case Studies

Memorial Colonnade

Ottawa, Ontario, Canada · 2008

Memorial Colonnade — seismic rehabilitation
Problem

The building had safety issues and required a major structural upgrade after being vacant for years.

CINTEC solution

A seismic retrofitting program was used to bring the monument up to modern expectations.

Technical notes

The project is a useful reference for conservation-led seismic strengthening of civic heritage.

Result

The colonnade was returned to safe service with its historic character preserved.