
Problem
The exterior wall system needed intervention where the brick wythe and floor slabs were not adequately tied together.
CINTEC solution
Corbel anchors were used to transfer vertical loads and stabilize the façade discreetly.
Technical notes
The repair kept the exterior appearance intact while addressing the structural deficiency in the wall assembly.
Result
The façade remained in service with improved load transfer and long-term stability.

