
Problem
The building experienced separation between the concrete plank flooring and the vertical walls shortly after completion.
CINTEC solution
CINTEC anchors were installed to reattach the structural elements without changing the visible character.
Technical notes
The work was designed to remain invisible while restoring load transfer between wall and floor assemblies.
Result
The building's structural integrity was restored and further separation was prevented.


